Company Name : |
|
Contact Name : |
|
Address: |
|
|
|
City: |
|
Pincode: |
|
Country: |
|
Email: |
|
Telephone: |
Ext:
|
Fax: |
|
Mobile: |
|
Enquiry Date: |
|
DC Machine Details (fill in if known) |
|
Governing Standards: |
|
Quantity: |
|
Required Delivery Date: |
|
Power Rating: |
kW |
Voltage: |
V |
Base Speed: |
rpm |
Field Excitation: |
V |
Ambient Temperature: |
(Deg. C) |
Is this machine meant for a Regeneration
Application: |
|
|
If yes, enter Input AC Supply Voltage
V |
Enclosure: |
|
Mounting: |
|
Duty Cycle: |
|
Duty Cycle Features (describe with respect
to application): |
|
Speed Range at Constant Torque: |
|
Speed Range at Constant Power: |
|
Force Cooling Position (ILFC Machines): |
|
Terminal Box Location: |
|
Shaft Extensions: |
|
Application (briefly describe): |
|
Overload Requirements: |
|
Maximum Vibration: |
mm/sec |
Maximum Noise Level: |
dB |
Over Speed: |
rpm |
Paint Shade: |
|
|
Describe Paint Shade if Other
|
Accessories |
|
Tachogenerator Mounting: |
|
|
Type and Make of Tachogenerator:
|
Inlet Air Filter for ILFC Machines: |
|
Air Flow Switch for ILFC Machines: |
|
PTC - Thermistors (1 in Main Pole and
1 in Interpole): |
|
Thermitech Relay Unit: |
|
|
Specify Voltage/Frequency/Phases of
Thermitech Relay Unit:
|
RTD for Windings - PT100 (1 in Main Pole
and 1 in Interpole): |
|
RTD for Bearings - PT100 (1 in each bearing): |
|
Space Heater: |
|
|
Specify Voltage/Frequency/Phases of
Space Heater:
|
Water Flow Switch (for ILWC): |
|
Water Leakage Detector (for ILWC): |
|
Standard Accessories |
|
RTD Heat Exchanger Standard (For CACA
Cooling - Frames 225 and above only) |
Pressure Switch Standard (For CACA Cooling
- Frames 225 and above only) |
Differential Pressure Switch Standard
(For CACA Cooling - Frames 225 and above only) |
Special Features: |
|
If Filled by IEC Salesman or IEC Authorized
Dealer: |
Name
Location
|